Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe – NH-HSIP-FMGR-0008(617)
Alabama Department of Transportation (ALDOT) · Etowah County, Alabama
Alabama Department of Transportation (ALDOT) is accepting bids for “Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe – NH-HSIP-FMGR-0008(617)” until Dec 4, 2026. Register at alletting.dot.state.al.us to submit.
- Due
- Dec 4, 2026 (time not stated)
- First seen
- Nov 8, 2026
- Bid number
- NH-HSIP-FMGR-0008(617)
- Where
- Statewide buyer
- Work
- Paving
What the buyer posted
ALDOT 12/04/2026 letting, call 24, project NH-HSIP-FMGR-0008(617) (Perry County): for constructing the Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe on SR-8 (US-80) from the Marengo County Line to the Dallas County Line. Length 6.144 mi. Bracket estimate $4,594,606–$5,615,630.
About Alabama Department of Transportation (ALDOT)
Alabama Department of Transportation (ALDOT) is a public buyer in Etowah County, Alabama. MondayBids lists 30 open bids from it right now.
Documents and addenda live with the buyer. Register on their portal so addenda reach you.